"REPORTER of the Association of Drilling Contractors" N 4, 2009

RECOMMENDATIONS FOR SELECTION AND IMPROVEMENT OF TECHNOLOGIES FOR EXPLORATION AND DEVELOPMENT OF RUSSIAN OFFSHORE FIELDS.

Vladimir V. Toropygin – lead researcher, LLC Research Center ZERS, PhD in Technical Sciences,
ntc_zers@mail.ru ntc_zers@mail.ru

Vladimir I. Vanifatiev – general director, LLC Research Center ZERS, PhD in Technical Sciences,
ntc_zers@mail.ru ntc_zers@mail.ru

Sergey V. Terentiev – chief designer, LLC Research Center ZERS,
ntc_zers@mail.ru ntc_zers@mail.ru

Konstantin V. Kempf – head of well technologies department , OJSC NK Rosneft, k_kempf@rosneft.ru

Currently, hydrofrac is widely used as a well stimulation technique in Western Siberia, both to drill new wells and to increase idle and marginal well production by sidetracking.
The paper considers the existing methods and procedures for hydrofracturing in sidetracks of reworked wells. Some technological solutions are presented, which involve the use of the UGRH-89/122 packoff device for massive hydrofrac operations in sidetracks with O102 mm liners.

Key words: well reworking, sidetrack, hydrofrac, packoff devices.

RECOMMENDATIONS FOR SELECTION AND IMPROVEMENT OF TECHNOLOGIES FOR EXPLORATION AND DEVELOPMENT OF RUSSIAN OFFSHORE FIELDS.

Vladimir V. Toropygin – lead researcher, LLC Research Center ZERS, PhD in Technical Sciences, ntc_zers@mail.ru
Vladimir I. Vanifatiev – general director, LLC Research Center ZERS, PhD in Technical Sciences, ntc_zers@mail.ru
Sergey V. Terentiev – chief designer,  LLC Research Center ZERS, ntc_zers@mail.ru
Konstantin V. Kempf – head of well technologies department , OJSC NK Rosneft, k_kempf@rosneft.ru

Currently, hydrofrac is widely used as a well stimulation technique in Western Siberia, both to drill new wells and to increase idle and marginal well production by sidetracking.
The paper considers the existing methods and procedures for hydrofracturing in sidetracks of reworked wells. Some technological solutions are presented, which involve the use of the UGRH-89/122 packoff device for massive hydrofrac operations in sidetracks with O102 mm liners.   

Key words: well reworking, sidetrack, hydrofrac, packoff devices.

 

Издан 3 номер за 2024 год ежеквартального научно — технического и производственного журнала "Bulletin of the Association of Drilling Contractors"

ISSN 2073-9877

The scientific and technical journal, “Bulletin of the Association of Drilling Contractors”, is listed by the Higher Attestation Commission of the RF Ministry of Education and Science as one of the leading refereed journals and publications that feature main scientific results of doctoral and candidate’s dissertations.

Jack-up "Arkticheskaya"

Jack-up "GSP Uranus"

SSDR "Ocean Endeavor"

SSDR "NAN HAI JIO HAO"

Jack-up "GSP JUPITER"

SSDR "RAKURYU-5"

SSDR «SCARABEO 9»

ООО «Шатскморнефтегаз», Saipem Drilling

DS "Deep Venture"

SSDR «WEST ALPHA»
EXXON MOBIL RUSSIA INC.