"REPORTER of the Association of Drilling Contractors" N 1, 2012

AUTOMATING THE MANAGEMENT OF DRILLING ENGINEERING WITHIN COMPLEX SYSTEM «DRILL WORKS PRODUCTION»
Farid, Farid A. – head of the drilling «TatNIPIneft», ffa@tatnipi.ru ffa@tatnipi.ru
Dec, Boris V. – head of the design of well construction «BelNIPIneft», b.detc@beloil.by b.detc@beloil.by
Palchunov, Valery P. – Cand.Tech.Sci., general director of «NVP MODEM», palchunov@gmail.com palchunov@gmail.com

УДК 622.24
Key words: automation, control systems, well construction, design institute, project documentation, project, order, estimate, engineering, drilling, and monitoring., мониторинг.

НDespite the notable success and increased use of information and communication technologies in drilling process automation field, many leading experts say about the deficit in informational technologies. Automation management system «Drill works production» (AMS DWP) developed by SIE Modem and successfully passed the practical approbation as for individual well construction and for mass construction of wells and cluster drilling originally designed for fill this information gap.The article describes innovative approaches implemented in the AMS DWP and directed to improve the level and quality of management decisions.

AUTOMATING THE MANAGEMENT OF DRILLING ENGINEERING WITHIN COMPLEX SYSTEM «DRILL WORKS PRODUCTION»
Farid, Farid A. – head of the drilling «TatNIPIneft», ffa@tatnipi.ru
Dec, Boris V. – head of the design of well construction «BelNIPIneft», b.detc@beloil.by
Palchunov, Valery P. – Cand.Tech.Sci., general director of «NVP MODEM», palchunov@gmail.com

Keywords: automation, control systems, well construction, design institute, project documentation, project, order, estimate, engineering, drilling, and monitoring.

Despite the notable success and increased use of information and communication technologies in drilling process automation field, many leading experts say about the deficit in informational technologies. Automation management system «Drill works production» (AMS DWP) developed by SIE Modem and successfully passed the practical approbation as for individual well construction and for mass construction of wells and cluster drilling originally designed for fill this information gap.
The article describes innovative approaches implemented in the AMS DWP and directed to improve the level and quality of management decisions.

 

 

Издан 3 номер за 2024 год ежеквартального научно — технического и производственного журнала "Bulletin of the Association of Drilling Contractors"

ISSN 2073-9877

The scientific and technical journal, “Bulletin of the Association of Drilling Contractors”, is listed by the Higher Attestation Commission of the RF Ministry of Education and Science as one of the leading refereed journals and publications that feature main scientific results of doctoral and candidate’s dissertations.

Jack-up "Arkticheskaya"

Jack-up "GSP Uranus"

SSDR "Ocean Endeavor"

SSDR "NAN HAI JIO HAO"

Jack-up "GSP JUPITER"

SSDR "RAKURYU-5"

SSDR «SCARABEO 9»

ООО «Шатскморнефтегаз», Saipem Drilling

DS "Deep Venture"

SSDR «WEST ALPHA»
EXXON MOBIL RUSSIA INC.