№3
Oshibkov A.V., Dvoynikov M.V., Frolov S.A., Svetashov V.N., Pankov V.N., khlopotov R.A.
CONTROL OF OPERATING CONDITIONS OF POWER SECTIONS OF POSITIVE DISPLACEMENT MOTORS
Gandzhumyan R.A., Kakharov S.K.
BENEFITS FOR SMOOTHBORE DRILLSTRING DRILLING CONDITIONS GEOTECHNICALBOREHOLES
Ionenko A.V., Gadzhiev S.G., Lipatnikov A.A., Leonov E.G.
ASSESSMENT OF COMPLETION DRILLING FLUID PERFORMANCE
Ropyanoy A.Yu., Skoblo V.Z., Strazhgorodskiy S.I.
UNINTERRUPTED WELL FLUSHING SYSTEM – SNP KURS
Postnov A.A., Oganov A.S.
ANALYTICAL COMPARISON OF AN OPEN-HOLE AND CASED HORIZONTAL WELLS WITH TRANSVERSE HYDRAULIC FRACTURES
Sorokin E.V., Kondratiev V.V., Sokol D.A., Labutin D.V., Bessel V.V., Fomin M.V., Nikolaev V.F., Dudiy P.V.
EXPANDABLE TUBULAR TECHNOLOGY FOR THE INSULATION OF LEAKY PRODUCTION STRINGS IN WELLS OPERATED BY TPP POVKHNEFTEGAZ, LLC LUKOIL – WESTERN SIBERIA
Aliev Z.S., Kotlyarova E.M., Marakov D.A.
THE APPROXIMATE METHOD OF ACCOUNTING FOR THE INFLUENCE OF THE ANISOTROPY PARAMETER ON THE PERFORMANCE OF HORIZONTAL WELLS IN DIFFERENT THICKNESS AND PERMEABILITY RESERVOIR
Demin V.I., Pahinyan L.A.
ANALYSIS OF DESIGN FEATURES OF ELECTROLYTIC GROUND ELECTRODES