"REPORTER of the Association of Drilling Contractors" N 4, 2013

BOP RISK ASSESSMENT BASED ON FAULT TREE ANALYSIS.
Ksandopulo, Svetlana Yu. – Dr.Tech.Sci., professor, director of the Institute of Technosphere Safety of the Kuban State Technology University, sksandopulo@mail.ru  sksandopulo@mail.ru
Marinin, Sergey Yu. – Cand.Tech.Sci., professor, the Kuban State Technology University, centr_kgtu@mail.ru centr_kgtu@mail.ru
Pashinyan, Leon A. – Cand.Tech.Sci., senior lecturer, the Kuban State Technology University, leonartash@mail.ru leonartash@mail.ru
Pashinyan, Karen L. – project manager, LLC ERIELL NEFTEGAZSERVIS, Novy Urengoy branch, leonartash@mail.ru leonartash@mail.ru

УДК 622.24
Key words: BOP, gas-oil-water showings, formation fluid blowouts, gusher, risk assessment
Blowout preventer is a complex system with dynamically changing set of parameters, comprising a certain number of components. New analytical methods of BOP operation risk assessment have been provided to improve blowout prevention capabilities. The following documents have been issued for the expert assessment of BOP operation risks: the expert assessment procedure; the procedure for expert group formation and assessment of representativeness based on  the expert’s aggregate index calculated on the basis of a scoring system; risk assessment methods, assessment tables, forms, risk range tables. Qualimetry-based methods have been provided to process the expert assessment results.

 

BOP RISK ASSESSMENT BASED ON FAULT TREE ANALYSIS.
Ksandopulo, Svetlana Yu. – Dr.Tech.Sci., professor, director of the Institute of Technosphere Safety of the Kuban State Technology University, sksandopulo@mail.ru
Marinin, Sergey Yu. – Cand.Tech.Sci., professor, the Kuban State Technology University, centr_kgtu@mail.ru
Pashinyan, Leon A. – Cand.Tech.Sci., senior lecturer, the Kuban State Technology University, leonartash@mail.ru
Pashinyan, Karen L. – project manager, LLC ERIELL NEFTEGAZSERVIS, Novy Urengoy branch, leonartash@mail.ru

УДК 622.24
Key words: BOP, gas-oil-water showings, formation fluid blowouts, gusher, risk assessment
Blowout preventers is a complex system with dynamic variation of parameters, consisting of a certain number of elements. New analytical methods of BOP risk assessment are used to ensure drilling safety. BOP risk assessment comprises the expert review procedure; the order of expert team development and performance assessment based on an aggregate expert index which is determined by scoring; risk assessment methods, scoring tables, fill-in-the-blank forms, risk ranking tables. A method based on qualimetry scales has been developed to process expert assessment results.

 

Издан 3 номер за 2024 год ежеквартального научно — технического и производственного журнала "Bulletin of the Association of Drilling Contractors"

ISSN 2073-9877

The scientific and technical journal, “Bulletin of the Association of Drilling Contractors”, is listed by the Higher Attestation Commission of the RF Ministry of Education and Science as one of the leading refereed journals and publications that feature main scientific results of doctoral and candidate’s dissertations.

Jack-up "Arkticheskaya"

Jack-up "GSP Uranus"

SSDR "Ocean Endeavor"

SSDR "NAN HAI JIO HAO"

Jack-up "GSP JUPITER"

SSDR "RAKURYU-5"

SSDR «SCARABEO 9»

ООО «Шатскморнефтегаз», Saipem Drilling

DS "Deep Venture"

SSDR «WEST ALPHA»
EXXON MOBIL RUSSIA INC.