"REPORTER of the Association of Drilling Contractors" N 3, 2015

EXPANDABLE TUBULAR TECHNOLOGY FOR THE INSULATION OF LEAKY PRODUCTION STRINGS IN WELLS OPERATED BY TPP POVKHNEFTEGAZ, LLC LUKOIL – WESTERN SIBERIA
Sorokin, Eduard V. – Head of downhole treatment technology department, LLC LUKOIL-Engineering;
Kondratiev, Vyacheslav V. – Head of well workover department, LLC LUKOIL-Engineering;
Sokol, Denis A. – Head of well workover group, TPP Povkhneftegaz;
Labutin, Denis V. – Head of geosteering group, Vatyegan field group, TPP Povkhneftegaz;
Bessel, Valery V. – Cand.Tech.Sci., executive vice president, LLC NewTech Services, professor at the Gubkin Russian State University of Oil and Gas;
Fomin, Mikhail V. – Head of well workover project, LLC NewTech Services;
Nikolaev, Vladimit F. – Head of well technology projects, LLC NewTech Services;
Dudiy, Petr V. – Head of engineering support group, LLC NewTech Services.

УДК 622.22

Key words: idle well stock, oil production loss, leaky interval in production string, expandable system, mechanic-hydraulic expansion.

Based on oil production data for 2014, the authors assessed oil production losses due to the idle well stock. It is shown that one of the key reasons for well conversion to idle well stock is leaky production strings in production wells. Production losses resulting from leaky production strings were assessed and a string insulation method was proposed which uses mechanical-hydraulic MaxWell expandable tubulars. The paper presents results of practical application of expandable systems in wells operated by TPP Povkhneftegaz and benefits of expandables for water zone isolation.

EXPANDABLE TUBULAR TECHNOLOGY FOR THE INSULATION OF LEAKY PRODUCTION STRINGS IN WELLS OPERATED BY TPP POVKHNEFTEGAZ, LLC LUKOIL – WESTERN SIBERIA
Sorokin, Eduard V. – Head of downhole treatment technology department, LLC LUKOIL-Engineering;
Kondratiev, Vyacheslav V. – Head of well workover department, LLC LUKOIL-Engineering;
Sokol, Denis A. – Head of well workover group, TPP Povkhneftegaz;
Labutin, Denis V. – Head of geosteering group, Vatyegan field group, TPP Povkhneftegaz;
Bessel, Valery V. – Cand.Tech.Sci., executive vice president, LLC NewTech Services, professor at the Gubkin Russian State University of Oil and Gas;
Fomin, Mikhail V. – Head of well workover project, LLC NewTech Services;
Nikolaev, Vladimit F. – Head of well technology projects, LLC NewTech Services;
Dudiy, Petr V. – Head of engineering support group, LLC NewTech Services.

Key words: idle well stock, oil production loss, leaky interval in production string, expandable system, mechanic-hydraulic expansion.

Based on oil production data for 2014, the authors assessed oil production losses due to the idle well stock. It is shown that one of the key reasons for well conversion to idle well stock is leaky production strings in production wells. Production losses resulting from leaky production strings were assessed and a string insulation method was proposed which uses mechanical-hydraulic MaxWell expandable tubulars. The paper presents results of practical application of expandable systems in wells operated by TPP Povkhneftegaz and benefits of expandables for water zone isolation.

 

Издан 3 номер за 2024 год ежеквартального научно — технического и производственного журнала "Bulletin of the Association of Drilling Contractors"

ISSN 2073-9877

The scientific and technical journal, “Bulletin of the Association of Drilling Contractors”, is listed by the Higher Attestation Commission of the RF Ministry of Education and Science as one of the leading refereed journals and publications that feature main scientific results of doctoral and candidate’s dissertations.

Jack-up "Arkticheskaya"

Jack-up "GSP Uranus"

SSDR "Ocean Endeavor"

SSDR "NAN HAI JIO HAO"

Jack-up "GSP JUPITER"

SSDR "RAKURYU-5"

SSDR «SCARABEO 9»

ООО «Шатскморнефтегаз», Saipem Drilling

DS "Deep Venture"

SSDR «WEST ALPHA»
EXXON MOBIL RUSSIA INC.