№2
Dvoinikov M.V., Kunshin A.A.
IMPROVING THE TOPOLOGY AND DYNAMIC CHARACTERISTICS OF THE TOOLING CASING STRING LINER FOR COMPLETING HORIZONTAL WELLS
Pham Van Hieu, Oganov A.S.
RESEARCH THE PORE PRESSURE IN SHALE FORMATION – CASE STUDY OF BLOCK 09-1 ON SHELF OF VIETNAM
Klimov V.V., Savenok O.V., Leshkovich N.M.
THE CONCEPT OF GEOLOGICAL AND GEOPHYSICAL MONITORING OF THE TECHNICAL CONDITION OF CASING STRINGS AND CEMENTED CAVING SPACE IN WELLS AT OIL AND GAS FIELDS AND UNDERGROUND GAS STORAGE FACILITIES
Petrenko V.E., Mirzoev D.A. - Ogly, Bogatyreva E.V., Fedorishchev V.A.
BASIC PRINCIPLES OF CHOOSING THE TYPE OF FIELD FACILITIES FOR THE LENINGRAD GAS CONDENSATE FIELD
Emirov Z.A., Gelfgat M.Ya.
COMPARATIVE HYDRAULIC ANALYSIS OF WELL WASHING WHEN COILED TUBING DRILLING WITH ELECTRODRILL AND PDM
Ulyanova Z.V., Kulyshev Y.A., Krysin N.I.
THE TECHNOLOGY OF OBTAINING A NEW TYPE OF SEALANTS, PREINSTALLED ON THE DIRECTIONAL ACTION CARRIER
Mishchenko I.T., Bravichev K.A., Kazakov K.V., Shaykhlislamova E.R.
ANALYZING EFFECTIVENESS OF THE APPLICATION OF CYCLIC WATERFLOODING TECHNOLOGY IN HETEROGENEOUS COMPARTMENTALIZED RESERVOIRS
Pelipenko N.A., Protsuk I.S., Baklanov R.R.
RESULTS OF EXPERIMENTAL RESEARCH DRILLING PROCESS
Kulpin D.L., Guseynov Ch.S., Bloch S.S.
TOWARDS QUESTION ABOUT LEARNING MURMANSK GAS FIELD