"REPORTER of the Association of Drilling Contractors" N 1, 2010

ENSURING ENVIRONMENTAL SAFETY WHILST CREATING AND VALIDATING A DETAILED WELL DESIGN

Yury G.Bezrodny – head of environmental laboratory, LLC “LUKOIL-VolgogradNIPImorneft”,
yubezrodny@lukoilvmn.ru yubezrodny@lukoilvmn.ru

Key words: detailed design, environmental safety, environment, well drilling.

Analysis of the process of development and validation of a detailed oil and gas well design shows that problems which may arise are mainly due to a poor and incomplete environmental feasibility study required to obtain a license to develop mineral resources, investment projects, and environmental impact assessment. Another issue that becomes apparent during the process is the lack of research and methods which would meet current requirements.

ENSURING ENVIRONMENTAL SAFETY WHILST CREATING AND VALIDATING A DETAILED WELL DESIGN

Yury G.Bezrodny – head of environmental laboratory, LLC “LUKOIL-VolgogradNIPImorneft”, yubezrodny@lukoilvmn.ru

Key words: detailed design, environmental safety, environment, well drilling.

Analysis of the process of development and validation of a detailed oil and gas well design shows that problems which may arise are mainly due to a poor and incomplete environmental feasibility study required to obtain a license to develop mineral resources, investment projects, and environmental impact assessment. Another issue that becomes apparent during the process is the lack of research and methods which would meet current requirements.

 

 

Издан 4 номер за 2021 год ежеквартального научно — технического и производственного журнала "Bulletin of the Association of Drilling Contractors"

ISSN 2073-9877

The scientific and technical journal, “Bulletin of the Association of Drilling Contractors”, is listed by the Higher Attestation Commission of the RF Ministry of Education and Science as one of the leading refereed journals and publications that feature main scientific results of doctoral and candidate’s dissertations.

2021
№ 1, №2, №3, №4

2020
№ 1, № 2, № 3, № 4

2019
№ 1, № 2, № 3, № 4

2018
№ 1, № 2, № 3, № 4

2017

№ 1, № 2, № 3, № 4

2016
№ 1, № 2, № 3, № 4

2015
№ 1, № 2, № 3, № 4

2014
№ 1, № 2, № 3, № 4

2013
№ 1, № 2, № 3, № 4

2012
№ 1, № 2, № 3, № 4

2011
№ 1, № 2, № 3, № 4

2010
№ 1, № 2, № 3, № 4

2009
№ 1, № 2, № 3, № 4

2008
№ 1, № 2, № 3, № 4

за 2007 год
№ 1, № 2, № 3, № 4

за 2006 год
№ 1, № 2 № 3, № 4

за 2005 год
№ 1, № 2 № 3, № 4

за 2004 год
№ 1, № 2, № 3, № 4

за 2003 год
№ 1, № 2, № 3, № 4

за 2002 год
№ 1, № 2, № 3, № 4

за 2001 год
№ 1, № 2, № 3, № 4

за 2000 год
Пилотный выпуск, № 1, № 2, № 3

Jack-up "Arkticheskaya"

Jack-up "GSP Uranus"

SSDR "Ocean Endeavor"

SSDR "NAN HAI JIO HAO"

Jack-up "GSP JUPITER"

SSDR "RAKURYU-5"

SSDR «SCARABEO 9»

ООО «Шатскморнефтегаз», Saipem Drilling

DS "Deep Venture"

SSDR «WEST ALPHA»
EXXON MOBIL RUSSIA INC.