"REPORTER of the Association of Drilling Contractors" N 2, 2015

OPTIMIZATION OF THE PROCESS OF CONSTRUCTION OF DEEP WELLS ON THE BASIS OF GEOLOGIC-GEOPHYSICAL AND TECHNOLOGICAL RESEARCH
Mammadov Samir Masud-Ogly— director of offshore and overseas projects LLC NewTek Sevices, smammadov@nt-serv.com

Key wordswell, borehole deepening; completion; productive reservoir; instability; control, technology, system analysis.

he paper focuses on the system analysis of geological, geophysical and technical information, based on the SKAN-14 software which is designed to provide practical solutions for control of deep well drilling in complex geological conditions, given instability of geological, geophysical, technical and hydrodynamic processes which occur whilst deepening a borehole. Examples are provided to illustrate the use of correlation spectroscopy in real time drilling







 

The year 2020 number 2nd issue of the quarterly journal, "Bulletin of the Association of Drilling Contractors", is now available "Bulletin of the Association of Drilling Contractors"

ISSN 2073-9877

The scientific and technical journal, “Bulletin of the Association of Drilling Contractors”, is listed by the Higher Attestation Commission of the RF Ministry of Education and Science as one of the leading refereed journals and publications that feature main scientific results of doctoral and candidate’s dissertations.

Арктическая

Uranus

Ocean Endeavor

NAN HAI JIO HAO

JUPITER

HAKURYU-5

ППБУ "SCARABEO 9"

ООО «Шатскморнефтегаз», Saipem Drilling

Deep Venture

ППБУ «WEST ALPHA»
(«Эксон Мобил Раша Инк.»)