№4
Baranov L.A., Pershin N.V.
CHANGE IN THE PERFORMANCE INDICATOR OF THE LIQUEFIED NATURAL GAS PLANT DEPENDING ON THE INFLUENCE OF THE METEOROLOGICAL FACTOR
Mamedbekov O.K., Bessel V.V.
EXPERIENCE OF COMPLETION OFFSHORE WELLS IN THE AZERBAIJANI SECTOR OF THE CASPIAN SEA
Egorova E.V., Minchenko Yu.S., Belozerov V.S.
STUDY OF REINFORCED EXPANDABLE CEMENT MATERIALS
Korabelnikov M.I., Bastrikov S.N., Ovchinnikov V.P., Aksenova N.A.
THE IMPROVED THREADED TOOL JOINT OF DRILLING PIPES
Ganiev R.I., Agliullin A.H., Ismakov R.A.
“U-TUBE” EFFECT DURING DUAL GRADIENT DRILLING AND DRILLING UPPER INTERVALS OF OFFSHORE WELLS
Amangeldiyeva D., Aliyeva A.A.
HANDLING HIGH-INTENSITY BRINE INFLUXES IN A SALT FORMATION USING MANAGED PRESSURE DRILLING TECHNOLOGY
Garipov A.V., Galimkhanov A.R., Tur D.Yu., Khalilov A.S., Pogurets V.V., Rybalkin A.A., Yavorskiy A.A., Maltsev V.A.
RATE OF PENETRATION INCREASE AS A RESULT OF NEGATIVE-PULSE TELEMETRY APPLICATION WITH COMPRESSED DATA TRANSMISSION
Dokunikhin V.B., Milenkiy A.M., Yavorskiy A.А.
ACHIMOV HORIZONTAL WELL DRILLING TECHNOLOGY USING MULTIPLE-STAGE WELL INTERVENTION. CHALLENGES. ANALYSIS. SOLUTIONS
Litvinov L.N., Lubyanyy D.A., Abed Fattah Muriby, Mohamad El Dhaybi
USE OF SHOE SMART REAMER SHOE DEVICES EXPERIENCE FOR RUNNING CASING TO HI-TECH WELLS
Efimov Ya.O.
ASSESSMENT OF THE AUTUMN PROCESSES IMPACT ON ICEBERG SAFETY OF EXPLORATION DRILLING